Next-Gen Highways reimagine interstate corridors as multi-use infrastructure—co-locating buried high-voltage direct current (HVDC) transmission and fiber-optic cables inside existing transportation right-of-ways (ROWs).

Scroll down (or click any mile marker above) to travel the corridor and inspect the policy, economic, and engineering trade-offs.

Benefit 1 • Mile 10

Lower Installation & Permitting Costs

  • Single Public Landowner: Negotiating with one state DOT instead of thousands of private parcels cuts development timelines in half and saves $1B+ per 2 GW project.
  • "Dig Once" Policy: Modeled on Minnesota's 2013 law, utility conduits are trenched during routine roadwork up to 300 ft from rural road edges.
  • New State Revenue: DOT utility lease fees and P3s directly fund highway maintenance.
Benefit 2 • Mile 20

Reducing the Need for Eminent Domain

  • Avoiding Takings: Siting lines longitudinally in existing public corridors avoids Fifth Amendment condemnations and historic community displacement.
  • Wisconsin Badger-Coulee Precedent: Routing along the interstate avoided impacting 200–300 private property owners.
  • Strong Public Support: 77% of Iowa voters backed highway transmission siting—rising to 82% when framed as an eminent domain alternative.
Benefit 3 • Mile 30

Meeting Surging Electricity Demand

  • The "Age of Electricity": U.S. demand is growing ~2% annually (+420 TWh/yr through 2030), led by AI data centers (~50% of growth), reshoring, and EVs.
  • National Macro Grid: Interstates connect remote wind/solar to cities—delivering $2–$3 in benefits per $1 invested.
  • Corridor Charging: Enables multi-megawatt heavy-duty truck charging hubs every 100–150 miles.
Opposition 1 • Mile 45

Agency Fragmentation & Bureaucracy

Highways are publicly funded by DOTs/FHWA, while transmission is privately financed and regulated by FERC, RTOs, and state PUCs. AASHTO warns of DOT staffing bottlenecks and competitive neutrality disputes.

Policy Fixes: 2009 WisDOT–PSCW Cooperative Agreement, Minnesota statutory siting timelines (Minn. Stat. § 161.45), and P3 multi-utility duct banks.
Opposition 2 • Mile 60

Right-of-Way Easement Limitations

State DOTs do not hold outright fee-simple ownership along every highway mile. Many older rural segments are roadway-only easements; adding commercial utilities can trigger Fifth Amendment inverse condemnation lawsuits.

Planning Fixes: Early GIS title screening, mandatory developer Constructability Reports, and explicit statutory energy corridor designations (Maine & Wisconsin).
Opposition 3 • Mile 75

Safety, Maintenance & Grid Interference

Aboveground poles violate DOT clear-zone crash standards, maintenance closures cause congestion (UK RIS2), and overhead AC lines induce dangerous voltages on metal guardrails.

Engineering Fixes: Buried solid-dielectric (XLPE) HVDC cables 5 ft deep beneath concrete protective slabs, zero EMF guardrail interference, and off-highway converter stations.
Opposition 4 • Mile 90

Competing Land Use: The "Soft Estate"

Ecological planners argue roadside verges should remain low-intensity green infrastructure—such as The Ray's I-85 perennial wildflower meadows in Georgia—for pollinators, carbon sequestration, and stormwater bioswales.

Balance: Trenchless horizontal directional drilling preserves topsoil, bioswales, and UK-style Biodiversity Net Gain habitats.
Destination • Mile 100

Conclusion: Integrated Corridor Governance

Next-Gen Highways offer a high-leverage path to accelerate clean energy transmission, power freight electrification, and spare private landowners from eminent domain—provided states pair buried HVDC engineering with clear title screening, ecological protection, and DOT–utility agreements.

↓ Scroll to Drive Down the Corridor ↓

Bibliography

American Association of State Highway and Transportation Officials, “AASHTO Comments on ‘Corridors of Commerce’ Program,” AASHTO Journal, September 18, 2026, https://aashtojournal.transportation.org/aashto-comments-on-corridors-of-commerce-program/ 

Brutkoski, Donna. “In New Poll, Iowans Strongly Prefer Siting Electric Transmission Lines Along Highway Corridors Versus Private Land.” Nextgen Highways. March 26, 2025, https://nextgenhighways.org/wp-content/uploads/2025/03/Iowa-Survey-News-Release-2025.pdf

Cosby, Robert L. “Gentrification and the History of Power and Oppression of African Americans in Washington DC.” COAS Centers, Howard University, Accessed on October 13, 2026, https://coascenters.howard.edu/gentrification-and-history-power-and-oppression-african-americans-washington-dc 

 Deppish, Breanne. “Lack of chargers, range anxiety, and reliability fears make drivers wary of EVs.” Washington Examiner. April 11, 2023, https://www.washingtonexaminer.com/policy/infrastructure/2741049/lack-of-chargers-range-anxiety-and-reliability-fears-make-drivers-wary-of-evs/ 

Duffy, Sean. “America has thousands of miles of corridors. Why not put them to extra use?” Washington Post. September 10, 2026, https://www.washingtonpost.com/opinions/2026/09/10/trump-dot-use-highway-rail-corridors-power-other-utilities/  

International Energy Agency (IEA). “Electricity 2026.” IEA. Paris, https://www.iea.org/reports/electricity-2026, Licence: CC BY 4.0

Liscow, Zachary, Joseph S. Shapiro, and Heidi L. Williams. “Federal Eminent Domain and Interstate Energy Infrastructure: Evidence from History.” NBER Working Paper 36027 (2026). Page 2. https://doi.org/10.3386/w36027.

National Academies of Sciences, Engineering, and Medicine. “Reinventing the Right of Way: Policy, Technical, and Economic Implications of Siting Transmission Lines Along Transportation Corridors: Proceedings of a Workshop—in Brief.” 2025. National Academies Press. Accessed on October 8, 2026. https://doi.org/10.17226/29178.

Putnam, Morgan, Tracy Warren, and Laura Rogers. “NextGen Highways Feasibility Study for the Minnesota Department of Transportation.” NGI Consulting, The Ray, Great Plains Institute, Satterfield Consulting, and 5 Lakes Energy. 2002. Page 7. Accessed on October 13, 2026,  https://nextgenhighways.org/wp-content/uploads/2023/01/NextGen-Highways-Feasibility-Study-Minnesota-DOT.pdf 

SoRelle, Mallory E. and Alexis N. Walker. “Partisan Preemption: the Strategic use of Federal Preemption Legislation.” Publius: The Journal of Federalism. Volume 46, Issue 4, Fall 2016. Pages 486–509. https://doi.org/10.1093/publius/pjw005. 

The Ray. “Leveraging Transportation Rights-of-Way for Energy Projects.” April 4, 2025. Accessed on October 12, 2026. https://www.theray.org/research-development/leveraging-transportation-rights-of-way-for-energy-projects